How to Choose a Web Designer

📖 20 min readWebsite Management
GW
GoWebsited
Published 14 October 2026 · Updated 14 October 2026

How do I choose a web designer?

Decide what the site has to achieve before you talk to anyone, then judge candidates on three things: work they have done for businesses like yours that you can actually visit, a clear written process with dates and decision points, and a straight answer about who owns the domain, the hosting and the site when the project ends. Price is the last filter, not the first. The cheapest quote and the most expensive quote in a small business web project are usually describing completely different amounts of work.

Key takeaways

  • Write the brief first. Two pages describing what the site must do beats any amount of comparing designers, because it turns vague quotes into comparable ones.
  • Visit their live sites. Not screenshots. Open them on a phone, check the speed, fill in a contact form. A portfolio is a claim, a live site is evidence.
  • Ownership is the question people forget. Your domain, your hosting, your accounts, in your name. Get that in writing before any money moves.
  • Process beats talent for small projects. A designer who tells you what happens each week, with your decisions marked, is more valuable than a prettier portfolio.
  • Content is the usual delay. Most projects stall waiting for text and photographs. Agree who writes what before the timeline is set.
  • Ask what happens after launch. Updates, backups, security and fixes either belong to someone or become your problem in month three.

What this guide covers

  1. What you are actually buying
  2. Who you can hire
  3. Decide these before you talk to anyone
  4. What a two page brief contains
  5. Building a shortlist
  6. How to read a portfolio
  7. Questions that reveal competence
  8. Reading a quote
  9. Why prices vary so much
  10. Ownership: domain, hosting, accounts
  11. What a good process looks like
  12. Who writes the content
  13. Realistic timelines
  14. What happens after launch
  15. What the agreement should cover
  16. Privacy, accessibility and the legal bits
  17. Search and what a designer can honestly promise
  18. If you already have a designer you have outgrown
  19. Red flags
  20. The cheapest option, and what it costs later
  21. Mistakes that make this expensive
  22. Frequently asked questions

What you are actually buying

Most small businesses think they are buying a design. They are buying a working system: pages that load quickly on a phone, a way for customers to contact or buy, content that explains the business, something that appears in search, and an arrangement for keeping all of that running afterwards.

That matters because it changes who is a good fit. A designer who produces a beautiful layout and hands over a site with no way to edit it, no analytics, no backups and a contact form that fails silently has delivered the picture and not the system. The picture is the part clients look at and the system is the part that earns money.

The sentence that focuses everything Finish this before you start looking: “The website is successful if it ____ .” Enquiries, bookings, sales, fewer phone calls asking the same question. A designer who knows the answer can design for it. Without it, everyone is guessing about taste.

Who you can hire

Freelance designer

One person, usually the cheapest of the professional options and the most variable. Excellent when they are good, exposed when they are ill, busy or move on.

Small agency or studio

A team, so more capacity and cover, and more process. Costs more, and you may not get the person you met at the pitch.

Productised service

A fixed package at a fixed monthly or one off price, usually built on a proven setup. Less bespoke, far more predictable, and maintenance is normally included.

Do it yourself

Cheapest in money, most expensive in your time. Sensible for a simple site if you enjoy it. We compared it properly in our guide to DIY builders and managed services.

None of these is better in general. What matters is matching the option to how much the site has to do and how much of it you want to own afterwards.

Decide these before you talk to anyone

  1. What the site must achieve. In business terms, not design terms. Enquiries, bookings, sales, credibility for a specific audience.
  2. Who it is for. The customer you actually want more of, not everyone.
  3. What it must contain. The pages you know you need, and anything essential such as booking, payments, a members area or multiple languages.
  4. Who owns the content. Text, photographs, logos. If you have none of it, say so now, because it changes the quote and the timeline.
  5. Your budget range. Withholding it wastes everyone’s time and produces quotes that describe different projects.
  6. When you need it live, and whether that date is real or aspirational.
  7. Who decides. One person signs off. Committees are why web projects run long.

Two pages covering those is a brief. Send the same one to everybody and the quotes become comparable, which is the single biggest improvement you can make to this process.

What a two page brief actually contains

Most people stall at writing the brief because it sounds like a formal document. It is not. It is the answers you would give in the first meeting, written down once so you do not give three slightly different versions to three designers.

The whole thing

  • One paragraph on the business, what you sell, to whom, where.
  • What the site must achieve, in business terms, with the single most important action named.
  • The pages you know you need, plus anything functional such as booking, payment or a members area.
  • What exists already, domain, hosting, current site, logo, photographs, text.
  • What you will provide and what you need them to do, particularly for content and images.
  • Budget range and target date, both honest.
  • Who decides and who else must be consulted. Name them.

That is enough for a designer to quote accurately and for you to compare three quotes on the same basis. Spending an hour on it is the highest return hour in the entire project, and the people who skip it are the ones who later feel that everyone quoted for something different, because everyone did.

Building a shortlist

Three candidates is enough. Five is a research project. Find them the way you would find any supplier: ask businesses like yours who built their site, look at the sites of businesses you admire locally and find the credit, and search for people who work with your industry.

Weight local knowledge appropriately. It matters for a business whose customers are local, because a designer who knows the area understands the market and can be met in person. It matters very little for a business selling nationally, where the right specialist may be anywhere.

How to read a portfolio

A portfolio page is a set of claims. Turn it into evidence by opening the actual sites, and do it on a phone, because that is where most of their visitors are.

For each example, check

  • Is it still live and does it still look like the screenshot.
  • Does it load quickly on mobile data, not office wifi.
  • Can you tell what the business does within a few seconds of landing.
  • Is the contact path obvious, and does the form work if you test it politely.
  • Is it a business like yours, in scale and complexity, rather than a famous logo they touched once.
  • Did they build it or style it, which is a fair question to ask directly.
  • Has it been maintained, or is the copyright line three years old.

Our guide to checking a site on mobile gives you the ten minute version of that inspection, and it applies just as well to somebody else’s work as to your own.

Questions that reveal competence

Most questions get the same reassuring answer from everyone. These do not.

Ask all of these

  • What will this site be built on, and why that? You want a reason connected to your situation, not a preference.
  • Who owns the domain, the hosting and the accounts afterwards? The only acceptable answer is that you do, in your name.
  • How will I edit it myself? And ask to see the editing screen, not a description of it.
  • What is included after launch, and for how long? Bug fixes, updates, backups and support, with a period attached.
  • What do you need from me, and when? A designer who can answer this precisely has run projects before.
  • What happens if the project runs over? On their side and on yours.
  • Can I speak to two clients from the last year? Recent ones, not the flagship from 2021.
Two people looking at a website on a laptop screen together
The most useful questions are about ownership, process and what happens after launch, not about design taste.

Reading a quote

A quote should tell you what is included, what is excluded, what it costs, when payments fall due and what happens if something changes. Most small business web quotes are a number and a paragraph, which is why comparing them is so frustrating.

Ask for the exclusions specifically, because that is where the difference between two quotes usually lives. Content writing, photography, the number of pages, ecommerce setup, email setup, migration of an old site, redirects, training, and post launch support are all commonly assumed by the client and excluded by the designer. None of that makes a quote dishonest. It makes it incomplete, and an incomplete quote becomes a series of awkward conversations later.

Beware the unlimited revisions promise It sounds generous and it is usually a sign that nobody has defined the process. Projects with unlimited revisions run long, and the cost is either absorbed by a resentful supplier or recovered somewhere you cannot see. A defined number of revision rounds at defined stages is a better sign.

Why prices vary so much

The same brief can attract quotes that differ by a factor of ten, and the spread is real rather than a negotiation game. At the low end you are typically buying a template, lightly adjusted, with your content pasted in and nothing else. At the high end you are buying research, custom design, custom development, content work, testing and ongoing responsibility.

Neither is wrong. A simple business with a clear offer may be well served by the first. A business whose website is its main sales channel usually is not. What matters is knowing which one a quote describes, which you find out by asking what is included rather than by looking at the number. We set out the real cost components in our guide to the true cost of a business website.

Ownership: domain, hosting, accounts

This is the part that causes the most damage and gets the least attention, because it only matters at the moment the relationship ends.

Insist on all of these

  • The domain registered in your business name, in an account you control, with your email on it.
  • The hosting account in your name, or clearly transferable, with the plan and cost known to you.
  • Administrator access to the website, in your own account, from launch.
  • Analytics and Search Console owned by you, with the designer added as a user rather than the reverse.
  • A copy of the site, files and database, or an export, handed over at the end.
  • Any licences listed, with what they cost annually and whose account they sit in.

A designer who resists this is telling you something useful. A domain registered inside a supplier’s account is the single most common reason a small business cannot move its website, and the conversation to fix it always happens at the worst possible time.

What a good process looks like

  1. Discovery. A conversation about the business, the customer and what the site must achieve. Short, but skipping it is why sites look nice and sell nothing.
  2. Structure. The pages and how they connect, agreed before any design. Cheap to change now, expensive later.
  3. Content. Text and images gathered or written. The stage that delays most projects, so it belongs early.
  4. Design. One or two key pages designed and approved, then the rest built to match.
  5. Build. The site assembled, usually on a staging address you can see.
  6. Review and test. You check content and links, they check speed, mobile, forms and search basics.
  7. Launch and handover. Going live with redirects if you are replacing a site, plus logins, training and documentation.

The details vary and the shape should not. If a proposal has no stages, no dates and no points where you approve something, the project has no structure, and structure is what keeps a small project from drifting for six months.

Who writes the content

Content is where web projects go to die. The design is finished, the build is waiting, and everyone is waiting for the client to write the About page.

Settle it in the quote. Either you write it, and you commit to dates, or they write it, and the price includes interviewing you properly, or you compromise: you provide rough material and they edit it into shape. The third is what most small businesses should choose, because the expertise has to come from inside the business and the writing does not.

Photography is the same question. Real photographs of your premises, your team and your work outperform stock images, and if you have none, decide who is arranging them before the timeline is agreed rather than after it slips.

Realistic timelines

A straightforward small business site is usually a few weeks of work spread over a longer calendar period, because the calendar includes waiting for you. Anyone promising a complex site next week is either using a template with your logo dropped on it or has not understood the brief.

Ask what the plan assumes about your response times, because that is the hidden dependency. A schedule that requires feedback within two days from someone who is running a business full time will slip, and the slippage will be blamed on whoever is less organised. Agree a realistic cadence at the start, and put the review dates in your own calendar.

What happens after launch

A website is not a finished object. Software updates arrive, plugins break, security patches matter, content goes stale, and something always needs fixing in the first month.

Included support period

Common and usually short. Find out exactly what it covers and when it ends.

Monthly maintenance

Updates, backups, monitoring and a small allowance of changes. The sensible default for most businesses without technical staff.

Ad hoc

You call when something breaks and pay by the hour. Cheapest until the week you need someone and they are busy.

You handle it

Viable if someone in the business will genuinely do it. Usually nobody does, and that is how abandoned sites happen.

Our guide to what a managed website service covers sets out what that work actually involves, whoever ends up doing it.

What the agreement should cover

In writing, before work starts

  • Scope, with the page count and any specific functionality named.
  • Price and payment schedule, including what triggers each payment.
  • Timeline with milestones, and what happens when either side misses one.
  • Revision rounds, how many and at which stages.
  • Ownership, of the domain, hosting, accounts, content and the finished site.
  • Post launch support, what is included and for how long.
  • Exit, what happens if either party walks away mid project, and what you receive.

For most small projects this is two or three pages, not a legal document. Its purpose is that both sides have written down the same expectations, which is where almost every web project dispute actually begins.

Privacy, accessibility and the legal bits

Ask who is responsible for the parts of the site that carry obligations rather than pixels. If the site collects any personal information, including through a contact form or analytics, it needs a privacy policy that reflects what you actually do, and the Office of the Privacy Commissioner publishes guidance for businesses at priv.gc.ca.

Accessibility is the other one. Any competent designer can build accessible pages, and many do not unless asked, so ask. It widens your audience, it overlaps almost entirely with good mobile design, and retrofitting it later costs far more than including it. Our guide to accessibility standards covers what to check.

Search and what a designer can honestly promise

A good designer sets up the foundations: page titles and descriptions, clean structure and URLs, fast loading, a sitemap, and a verified Search Console account in your name. That is the part that belongs in a build.

What nobody can honestly promise is a position in search results. Rankings depend on competition, content and links over time, none of which a launch controls. Treat a guaranteed first page claim as a reason to stop the conversation, and expect instead a clear statement of what the build includes and what would need ongoing work afterwards.

If you already have a site and a designer you have outgrown

Replacing a supplier is a different exercise from hiring one for the first time, and the risk sits in the handover rather than the build.

  1. Find out what you control. Log in to the registrar, the hosting and the site. If you cannot, that is the first job, and it is easier while the relationship is still civil.
  2. Take a full backup, files and database, and keep a copy somewhere the old supplier cannot reach.
  3. Export what matters. Content, images, analytics history and any customer data, in a format you can use.
  4. Record every URL. The new site will need redirects, and the list is much easier to gather before anything moves.
  5. Check what is on annual licences, and whose card they are on. This is where surprise expiry dates come from.
  6. End it cleanly. Pay what is owed, ask for the handover in writing, and thank them. The sector is small and a bad exit follows you.

Then brief the new designer on what exists rather than asking for a fresh start, because a rebuild that ignores the old site’s URLs and search history throws away visibility you already paid for. Our launch checklist covers the redirect mapping in detail.

A fair note on the incumbent Before replacing anyone, tell them what is not working. Some problems are a brief nobody updated or a maintenance arrangement that was never agreed, and they are cheaper to fix than a rebuild.

Red flags

Walk away when

  • They will not put ownership in your name. The most important single answer in this whole process.
  • There is no written scope, only a number and enthusiasm.
  • They guarantee search rankings. Nobody can.
  • The portfolio is screenshots with no live sites you can visit.
  • They cannot explain what happens after launch. It becomes your problem in month two.
  • Communication is slow before you have paid. It does not improve afterwards.
  • The price is far below everyone else with the same scope described. Something is missing, and you will find it later.

The cheapest option, and what it costs later

Cheap is a legitimate choice when the site is genuinely simple and the business is starting out. What turns it into an expensive choice is what usually comes bundled with it: no ownership, no documentation, no maintenance, and a builder who is unreachable within a year.

The pattern we see repeatedly is a business that pays a small amount for a site, cannot edit it, cannot find the person who built it, does not control the domain, and eventually pays several times the original price to rebuild from nothing. If you are going to spend at the low end, spend it where ownership and access are clear, and accept a simpler site rather than a cheaper arrangement.

“The expensive part of a cheap website is never the website. It is not being able to leave it.”

Mistakes that make this expensive

The recurring ones

  • Choosing on portfolio looks alone. Pretty is not the same as working.
  • No written brief. Quotes then describe different projects and cannot be compared.
  • Not testing their live sites on a phone. Two minutes that tells you more than any sales call.
  • Letting someone else own the domain. The problem that outlives the relationship.
  • Assuming content is included. The most common surprise in a quote.
  • No plan for after launch. Sites drift, break and go stale without one.
  • Deciding by committee. The reliable way to double a timeline.

One last piece of advice that applies whoever you hire. Keep your own file of everything that matters: the registrar login, the hosting details, the site administrator account, the analytics access, a copy of the final invoice and the written scope. Put it somewhere the business controls rather than in one person’s inbox. Every difficult website situation we are asked to untangle begins with nobody being able to find one of those six things, and every one of them takes minutes to save at the time.

It is also worth agreeing how you will work together week to week before the project starts. One channel for decisions, whether that is email or a shared document, so nothing important lives only in a phone call. A named day for feedback, so neither side is waiting. And a rule that changes to scope go in writing with any effect on price and timeline stated at the time rather than settled at the end. None of that is bureaucracy on a small project. It is the difference between a build that finishes and one that quietly drifts into its fourth month while both sides privately blame the other.

Looking for someone to build or take over your site?

We build and manage small business websites on a fixed monthly price, with the domain, hosting and accounts in your name from day one.

See our plans

Frequently asked questions

How do I choose a web designer?

Write a short brief describing what the site must achieve, send it to three candidates, and judge them on live sites you can visit for businesses like yours, a written process with dates and decision points, and a clear answer on who owns the domain, hosting and accounts afterwards. Compare price last.

How much should a small business website cost?

Quotes for the same brief vary enormously because they describe different amounts of work, from a lightly adjusted template to custom design, content and testing. Ask what is included and excluded rather than comparing headline numbers, and be specific about content, migration and post launch support.

Who should own the domain and hosting?

You should, in your business name, in accounts you control. A domain registered inside a supplier account is the most common reason a business cannot move its website later, and it is entirely avoidable at the start.

Should I hire a freelancer or an agency?

A freelancer is usually cheaper and more variable, an agency has more capacity and process, and a productised service trades bespoke design for predictability and included maintenance. Match the choice to how much the site has to do and how much cover you need.

Who writes the website content?

Decide before the quote is agreed. Either you write it to a deadline, the designer writes it after interviewing you, or you provide rough material and they edit it. Content is the most common reason web projects run late.

How long does a small business website take?

A few weeks of work, usually spread over a longer calendar because the schedule includes waiting for your feedback and content. Ask what response times the plan assumes, since that is the dependency that causes most slippage.

Can a designer guarantee first page on Google?

No. A build can set the foundations, including titles, structure, speed, a sitemap and Search Console, but rankings depend on competition, content and links over time. Treat a guarantee as a reason to end the conversation.

What should happen after launch?

Someone needs to handle updates, backups, security and fixes. Agree whether that is an included support period, a monthly maintenance arrangement, ad hoc paid work, or you. The last option only works if somebody in the business genuinely does it.

Ready to Stop Worrying About Your Website?

Plans start at $49/mo. No setup headaches, no tech stress.

See Plans & Pricing →